NelighConstruction.jpg

What are we up to?

We are in the process of building a state-of-the-art fiber-to-the-premise network. This network will allow for every resident, and business, in Neligh to gain access to SUPER fast and reliable Internet at an affordable rate. 

Construction Crews

Bauer LOGO 002 - Copy.jpg

D&M UNDERGROUND

Construction Map

MAP KEY

Green  -  Existing Fiber

Magenta - Aerial Fiber

Orange - Buried Fiber

Frequently Asked Questions (FAQs)

How do you have permission to dig in my yard?


We have obtained permits to use the city’s public right-of-ways.




What is a right-of-way?


In every city, they own a portion of your property in order for them to easily access city utilities. A right-of-way is described as the right to pass over or through property owned by someone else, usually based upon an easement. There may be a specific path that must be taken, or the right may be more general. The city has allowed us to use these rights-of-way in order to build our fiber network in Neligh. If you have questions regarding your property’s current easement, please contact the City of Neligh at 402-887-4066.




What is this new white box in my yard?


The “white box” you are referring to is a vault. This vault holds fiber optic cable that is used to power homes in your neighborhood with super-fast Internet! All vaults should be installed level with the ground and can be driven over with a mower. Once our construction project is complete, access to the vault by Stealth technicians will be infrequent. If you have any questions or concerns about the vault, or the condition of your yard, please contact us at 402-347-1010.

Photo of a Vault




When will service be available at my home?


Construction is currently set to conclude sometime in Summer 2021. Please check your local newspaper, our website, or Facebook page frequently for updates. You may also call 402-347-1010 to check on the progress of construction. You may also visit www.stealthbroadband.com/neligh to get signed up today!




What are your flags doing in my yard?


These flags are placed on your property in order to tell the construction crew where they can bury our fiber optic. Other companies have to mark their utility placements in order for us to avoid disturbing their underground utilities. Please see below to find out what the flag colors mean. It is very important to leave these flags in place until construction is complete. Once construction is complete, our contractors will remove the flags.

Red: Electric Power Lines, Cables, Conduit, and Lighting Cables.

Yellow: Gas, Steam, Petroleum or Gaseous Materials

Orange: Telecommunications, Cable TV, Signal Lines, Cables or Conduit.

Blue: Water

Green: Sewers and Drain Lines

Pink: Temporary Survey Markings

White: Proposed Excavation




What is this new green box in my yard?


The “green box” you are referring to is a fiber optic pedestal. This pedestal holds fiber optic cable that is used to power homes in your neighborhood with super-fast Internet! We try to locate pedestals in an area that will not impede access to your yard. As new customers sign up for service, Stealth technicians will access to pedestal to connect the customers to the fiber optic network. If you have any questions or concerns about the pedestal, or the condition of your yard, please contact us at 402-347-1010.

Photo of a Fiber Optic Pedestal




What are the new terminals hanging on the overhead lines?


In some areas of Neligh, Stealth is installing fiber optic service using existing City of Neligh owned pole lines. Stealth is installing a new metal strand and fiber optic cable between the poles. In the middle of each block at a minimum, there will be a multi-port service terminal hanging on the new fiber line. These terminals are used to connect customers to our fiber optic network. All overhead fiber installation is built to code and has been pre-approved by the City of Neligh.

Picture of Installed MST (multi-port service terminal)




What are the wood stakes doing in my yard?


Wood stakes with markings on them are installed by Stealth engineers to tell our contractors where to place vaults and pedestals. It is very important to leave these stakes in place until construction is complete. Once construction is complete, our contractors will remove the stakes. If you have a question or concern regarding the placement of stakes, please contact us at 402-347-1010.





Question, Concern, Complaint?

arrow&v